Drawings, files and
design changes

Send plans, elevations, sections and a colour and material schedule, ideally as AutoCAD drawings, and a situation plan with the scope of the model outlined. A quote needs less. Large changes are easy until the parts are cut. After that the model is checked in stages from photographs: structure first, then base colours, then details. Each stage closes when the next begins.

Guides · Updated

01The files

What to send

Item Preferred format Needed for If it is missing
Model scopeSituation plan with a clear outlineQuote and buildWe propose the outline ourselves and confirm it with you before quoting.
Elevations, all sidesAutoCAD (.dwg)Quote and buildThe model cannot be started.
Floor plansAutoCAD (.dwg)BuildDepths, balconies and setbacks are guessed. We ask.
SectionsAutoCAD (.dwg)BuildHeights and roof forms are taken from the elevations.
Colour and material scheduleA list with colour codes, or marked elevationsBuildColours are matched to renderings and confirmed with you.
Site plan with levelsAutoCAD (.dwg)Quote and build, when surroundings are shownLevels are drawn from survey data or aerial imagery.
Landscape planAutoCAD or PDFBuildPlanting is laid out to suit the site plan.
Purpose and dateA sentenceQuoteWe ask before quoting.

For a quote, the situation plan with the outline, the elevations and one sentence about what the model is for are enough.

Download our document list (PDF)

The full list, for the quote and for the build, in English and Dutch.

02In practice

What goes wrong
with files

A file too new to open. Drawings saved in the newest AutoCAD version do not always open elsewhere. Saving to an older version takes a minute and removes the question.

A PDF without dimensions. A PDF is a picture of a drawing. It can be traced, but without one known dimension it has no scale. Send the drawing file, or mark one length.

An export from a 3D model. Elevations exported from Revit or a similar program are fine, as long as they are exported as drawings and not as images.

No drawings at all. For an existing building this is common. We have drawn missing ground levels from aerial imagery, and for one commission a photographer spent four days on site recording buildings that had never been drawn. We can complete missing drawings ourselves; it is quoted with the model.

03The change window

What can change,
and until when

A model is built in six phases, and you see photographs at the end of the three that matter most. Each set of photographs is the moment to check that part of the model. Changes are sent within two days of receiving them.

Phase What happens What can still change
1. Data collectionThe drawings are gathered. Work starts when they are complete enough.Anything. Nothing counts as a change yet.
2. Drafting and cuttingThe drawings are redrawn as cutting drawings: walls, window frames and roofs, cut from ABS or acrylic.Large changes are still easy to make.
3. Skeleton assemblyWalls and roofs are glued. You receive photographs and check the structure: openings, heights, proportions.Three changes to the structure, within two days of the photographs.
4. Base colourWall, balcony and roof colours are sprayed. You receive photographs and check hue and position.The structure is now closed. Two changes to colours, within two days.
5. DetailingWindow frames, glass, railings and ledges are fitted. You receive photographs and check the details.Base colours are now closed. Three changes to details, within two days. Additions are always possible.
6. Dress-up and finishingPlants, signage, figures and cars.No changes. Additions are always possible.

A change here means a change to the drawings you supplied. If we misread a drawing, we put it right, and it does not count. Landscaping follows the same phases. Changes beyond these allowances can still be made, and are quoted separately.

04Why it works this way

Each layer closes
the one beneath

The order is not a policy. It follows from how a model is made. Once walls are glued, moving a window means rebuilding the wall. Once colour is sprayed, changing the structure means stripping it. Once the window frames are on, a wall cannot be resprayed without paint bleeding onto them.

So the practical advice is simple. If a design change is coming, say so before it is drawn. A change announced in the second phase costs a new cutting drawing. The same change in the fifth can mean building that part again.

05After delivery

Years later

A model can be changed after it has been delivered. Buildings are replaced when a design moves on, and an old model can be restored. We built the model of the Hugo Voeten Museum in 2009 and restored it in 2025.

For plans that are built in phases, the model can be made for it from the start. See a model for a masterplan built in phases.

06The quote

What shapes the price

Every model is quoted from its drawings. These are the things that move the price, roughly in this order: the scale, the size of the model and how much of the surroundings it shows, the level of detail, whether it is in colour or in white, lighting, the base and its cover, and the shipping.

The scale calculator gives the size of the model at any scale. Send what you have and we reply within one working day with questions and a price.

Send what you have. We ask for the rest.

We answer within one working day, in your language.